Project Story · Auburn Hills, MI
Tub and Tiled Stall Out, a Low-Threshold Shower With a Glass Screen In
This Auburn Hills bathroom had a drop-in jetted tub under the window and a separate tiled shower stall. Cameron and Dominic took both out and built one long walk-in shower where the tub was. The base sits low in the floor for an easy step in, and a fixed glass screen keeps the water in, with no door at all.
The Job
A Tub and a Stall, Made Into One Shower
This main-floor bathroom in Auburn Hills had a drop-in jetted tub under the window and a separate shower stall with framed glass doors in the corner. The floor was tile.
Both came out: the tub and its tile surround, the tiled stall and its base, the tile floor, the vanity, the toilet, the old mirror, and the light. The drywall stayed.
The new shower went into the tub’s spot, under the window. Cameron and Dominic set the new base down into the floor, so the step in is low, and moved the plumbing to the new spot from the basement below.
The base is Pure Biscuit Pro Stone, about 82 inches long, with smooth Biscuit Pro Stone walls and Pro Stone trim around the window. In place of a door, one fixed panel of heavy glass works as a screen to keep the water in, so there is nothing to slide or swing.
Inside are a corner caddy, a recessed soap box, a corner seat, and two brushed nickel grab bars. A fixed shower head and a handheld on a slide bar are brushed nickel too.
Where the old stall stood, two tall Sable linen cabinets now stand side by side. A 42-inch Sable vanity with drawers and doors, smaller than the old one, has a Pro Stone top. A comfort-height toilet and a new wood-look vinyl floor over new subfloor finish the room.
Cameron and Dominic did the installation in 11 working days. Kevin was the product specialist. The homeowner supplied the vanity light, the round mirror, and the cabinet handles and knobs, and painted the room after we finished. This is one Home Pro USA project in Auburn Hills. See more on our Oakland County page.
Every job carries the Manufacturer’s Limited Lifetime Warranty, plus our workmanship guarantee. Our own installers did the work, at a guaranteed price with no hidden costs.
Before
A Jetted Tub and a Tiled Stall
The bathroom at the measure visit, with the floor plan before the remodel.
After
A Low-Threshold Shower With a Glass Screen
The finished room after the 11-day install, with the floor plan. The homeowner painted after we finished.
Related
If You Like This Job
This project turned a tub and a separate stall into one easy walk-in shower. These pages cover the same kind of work.
- Oakland County bathroom remodeling
- Rochester Hills bathroom remodeling
- Troy bathroom remodeling
- A primary bath remodel in Lake Orion
- A tub and vanity remodel in Pontiac
- Full bathroom remodeling
- Pro Stone / cultured marble
- Shower doors and glass
- Vanities and countertops
- Bathroom flooring
- All projects
- Bathroom gallery
- Cost guide
Project FAQs
Questions About This Remodel
How long did this bathroom remodel take?
What is a low-threshold shower?
What is a shower screen?
Can a shower go where the tub was?
Is this kind of shower good for aging in place?
Do you work in Auburn Hills?
Start Your Remodel
Want a Shower Like This in Auburn Hills?
We can measure, bring samples, and write a clear quote before any work starts.
- In-home consult in Auburn Hills and across Oakland County
- Pro Stone showers, vanities, and floors with our own crew
- Written scope and price before installation
Schedule Your Free Consultation
Share a few details and we will follow up to schedule the visit.
Request received
Thank you. We have your request.
Our office will review it and follow up soon.
Prefer to talk now? Call (586) 754-2060.