Project Story · Pontiac, MI

Fiberglass Tub to Marble-Look Walls in Pontiac

A fiberglass tub surround came out of this upstairs bathroom in Pontiac. A new tub with marble-look walls to the ceiling went in, plus a gray vanity and a new floor. The home is near Telegraph and Walton.

CityPontiac, Oakland County
ProjectTub, vanity, and floor
Tub wallsMarble-look, to the ceiling
Install time5 working days
New white tub with marble-look walls up to the ceiling and a matte black curtain rod in Pontiac, MI
Finished tubMarble-look walls to the ceiling
More photos

The Job

A Fiberglass Surround Out, Marble-Look Walls In

This upstairs bathroom in Pontiac is long and narrow, with the tub at the far end. It had a fiberglass tub surround, a light wood vanity, and a linoleum floor. We tore all three out, along with the big wall mirror.

A new white tub went into the same spot. Marble-look walls now run all the way to the ceiling, with a built-in shelf caddy. The shower and spout are matte black, and a matte black rod holds the curtain.

Along the side wall, a 48-inch Steel Grey vanity with drawers carries a white Carrera Pro Stone top. A matte black faucet matches the tub. Armstrong Alterna flooring in Gray Mist finishes the room.

Adam and Dave did the installation in 5 working days. Jeff was the product specialist. Painting was left to the homeowner. This is one Home Pro USA project in Pontiac, near Telegraph and Walton, in Oakland County. Nearby work is on our Rochester Hills and Troy pages.

Before

A Fiberglass Tub and a Long Vanity

The bathroom before the remodel: the fiberglass tub surround, the long vanity, and the linoleum floor.

After

A New Tub, Gray Vanity, and New Floor

The finished room, photographed when our work was done. The patched walls were left ready for the homeowner to paint.

Related

If You Like This Job

This project replaced the tub, the vanity, and the floor. These pages cover the same kind of work.

Project FAQs

Questions About This Remodel

Can you replace a fiberglass tub surround?
Yes. Here the old tub and surround came out. A new tub and marble-look walls went in, running up to the ceiling.
Why take the walls to the ceiling?
It keeps steam off the paint and drywall above the tub. It also gives a clean, finished look.
How long did this remodel take?
Adam and Dave finished it in 5 working days. Most of our full remodels take 5-10 working days. Your written quote lists the full scope before work starts.
Did you paint the bathroom?
No. The homeowner chose to paint. The after photos show the walls ready for paint.
Do you work in Pontiac?
Yes. This home is near Telegraph and Walton in Pontiac, in Oakland County. We also remodel bathrooms in Rochester Hills and Troy.

Start Your Remodel

Want a Bathroom Like This in Pontiac?

We can measure, bring samples, and write a clear quote before any work starts.

  • In-home consult in Pontiac and across Oakland County
  • New tubs with walls that run to the ceiling
  • Vanities, tops, and flooring in one project
  • Written scope and price before installation

Schedule Your Free Consultation

Share a few details and we will follow up to schedule the visit.