Project Story · Milan, MI

Two Bathroom Updates in Milan

Two partial bathroom updates in one Milan home. The guest bath is a tub-to-shower conversion with an ESE bypass shower door and new vanity cabinets. The shower and vanity top are Pro Stone in Caraway. The floor in that room stayed. The master bath is a shower-stall replacement with a bifold shower door for a tight space. The master stall is Pro Stone in Cashmere.

CityMilan, Washtenaw County
ProjectTwo partial bathroom updates
GuestTub-to-shower, Pro Stone Caraway, ESE bypass
MasterPro Stone Cashmere stall, bifold door
Finished guest bathroom in Milan after a tub-to-shower conversion with an ESE bypass door and new vanity cabinets
Finished guest bathroomWalk-in shower and new cabinets More photos

The Job

A Guest Tub-to-Shower, Then a Master Shower Stall

This Milan home had two bathrooms updated as partial jobs, not full-room remodels. The guest bathroom is a tub-to-shower conversion. The old cast iron tub came out for a Caraway Pro Stone shower with walls up to the ceiling and grab bars. We installed an Arizona ESE bypass shower door with rain glass, plus new Merillat Classic maple vanity cabinets in Boardwalk with a matching Caraway Pro Stone top. The bathroom floor was not replaced.

The master bathroom kept its layout. We replaced the old fiberglass stall with a Pro Stone shower in Cashmere, with a recessed soap dish, a shampoo box, chrome grab bars, and a chrome Delta Linden 2-in-1, and installed the homeowner’s Aqua Fold bifold shower door. The homeowner asked for that door because the master bathroom has limited space.

Cameron installed the two bathrooms back to back in 14 working days in late October and early November 2024: 9 working days for the guest bath, then 5 for the master. Jeff was the product specialist. This is one Home Pro USA project in Milan, in Washtenaw County. Nearby work is on our Saline and Ann Arbor bathroom remodeling pages.

Guest Bathroom · Before

The Guest Bathroom Before the Tub-to-Shower

The first photo is the whole guest bathroom. The second is the old tub. The third is the old vanity.

Guest Bathroom · After

The Guest Walk-In Shower and New Vanity Cabinets

The first photo is the finished guest bathroom. The second is the new walk-in shower. The third is the new vanity cabinets. The floor in this room was not replaced.

Master Bathroom · Before

The Master Shower Stall Before Replacement

The first photo is the old shower stall. The second is the old shower base. The third is the stall being measured before the swap.

Master Bathroom · After

The New Master Shower Stall and Bifold Door

The first photo is the finished shower stall. The second is the new shower fixture. The third is the shower caddy. A bifold door was used because this room is tight.

Related Pages

If You Like This Job

This job is a guest tub-to-shower with new vanity cabinets and a master shower-stall replacement. These pages cover the same kind of work.

Project FAQs

Questions About This Kind of Remodel

Was this a full bathroom remodel?
No. Both rooms were partial updates. The guest bathroom is a tub-to-shower in Pro Stone Caraway with an ESE bypass door and new vanity cabinets. The master bathroom is a shower-stall replacement in Pro Stone Cashmere with a bifold door.
Did you replace the guest bathroom floor?
No. The guest bathroom floor was not replaced on this job.
Why a bifold shower door in the master bathroom?
The master bathroom has limited space. The homeowner asked for a bifold shower door so the new stall would still work in that footprint. The homeowner supplied the Aqua Fold bifold door, and we installed it with the new stall.
How long did the two bathrooms take?
14 working days, back to back, in October and November 2024: 9 for the guest bath and 5 for the master. A written quote will confirm the schedule for your home.
Do you remodel bathrooms in Milan and nearby Washtenaw County cities?
Yes. This job is in Milan. We also work across Washtenaw County, including Ann Arbor, Ypsilanti, and Saline.
What will a remodel like this cost?
Price depends on whether you are converting a tub to a shower, replacing a shower stall, adding a bypass or bifold door, and whether vanity cabinets or flooring are in the scope. Use the Metro Detroit cost guide for planning ranges, then get a written in-home quote.

Start Your Remodel

Want Bathroom Updates Like This in Milan?

If one bathroom needs a tub-to-shower and another only needs a new stall and the right door, we can measure both rooms, bring samples, and write a clear quote before demolition starts.

  • In-home consult in Milan and Washtenaw County
  • Partial updates or full remodels, room by room
  • Bypass, bifold, and other door options for tight spaces
  • Written scope and price before installation

Schedule Your Free Consultation

Share a few details and we will follow up to schedule the visit.