Bathroom remodeling in Farmington Hills, Michigan by Home Pro USA

Bathroom Remodeling Farmington Hills, MI

Farmington Hills bathroom remodeling, tub-to-shower conversions, and tub replacements by our own installers

About 6 in 10 Farmington Hills homes went up between 1960 and 1989, and many still have the original steel or cast iron tub, wall tile set over wire mesh, or acrylic panels added over old tile. We turn those tubs into walk-in showers, replace tubs and walls, and remodel full bathrooms. Our own crew handles it, start to finish.

START MY REMODEL

No obligation. Free in-home consultation.

Your Free Consultation Includes

  • An in-home visit with real Pro Stone and tile samples
  • Exact measurements of your tub or shower alcove
  • One written, all-in price before you decide
  • Advice drawn from bathrooms we have remodeled in Farmington Hills

4.8 average from 163 local reviews

Schedule Your Free Consultation

Free in-home consultation. No pressure.

A+ BBB · 4.8 avg · 163 Google reviews

Farmington Hills projects

Recent Bathroom Remodels in Farmington Hills

Four Farmington Hills bathroom projects our own crews completed, from Grand River up to 12 Mile, each listed by the nearest major roads. Slide the photos to see the tub and rain glass door near 11 Mile and Inkster.

  • Near 11 Mile and Inkster

    A New Tub and a Double Vanity for the Only Bath in the Home

    This is the only bathroom in the home. The steel tub, wall tile, framed shower door, vanity, and tile floor came out. In went a white BCI acrylic tub with Italian White Pro Stone walls, four corner shelves, and a Pro Stone window stool, plus a white Merillat Classic double vanity with a drawer bank under a 62-inch Carrera top with two wave bowls.

    Read the project story

    Matte black rain glass slider · Full remodels take 5-10 working days

  • Near 12 Mile and Inkster

    An Upstairs Tub Becomes a Shower With a Corner Seat

    Upstairs, the steel tub, the acrylic panels over the old tile, the shower door, the vanity, and two layers of flooring came out. The new 60-inch shower has a white Pro Stone base, Tender Grey walls from the floor to the soffit with a matching ceiling panel, three corner shelves, a corner seat, and a matte black sliding door. Two 24-inch Steel Grey vanities share one 69 1/2-inch Pro Stone top with two built-in bowls.

    New recessed light over the shower

  • Near Grand River, between Drake and Halsted

    Two Wet Areas Become One Shower With a Bench

    In this first-floor condo bath, we removed both wet areas: a steel tub with tile walls and a tiled shower with a pony wall, both set in mortar over wire mesh. In their place went one 60-inch shower on a custom Pro Stone pan, with Slate Pro Stone walls 96 inches tall, a built-in bench, a corner caddy, and a clear glass sliding door. A 48-inch Mist maple vanity with a matching linen cabinet sits under a Slate Pro Stone top.

    Two new LED recessed lights

  • Near 12 Mile and Middlebelt

    A Jetted Tub and an Old Shower Become One Walk-In Shower

    This first-floor bath had a drop-in jetted tub with mirror walls and a separate tiled shower. Both came out. The new walk-in shower fills the tub spot, with Italian White Pro Stone walls, a built-in bench, two chrome grab bars, and a clear glass panel.

    Read the project story

    Vanity, toilet, and floor kept · Done in 7 working days

Tell us which of these looks most like your bathroom, and we will bring the same samples to your consultation.

Get a Farmington Hills Quote

Farmington Hills Homes

What Farmington Hills Bathrooms Usually Need

Farmington Hills grew mostly from the 1960s through the 1980s, with a mix of single-family houses, condos, and apartments. Many bathrooms still have their original tub, tile, and vanity.

Home Pro USA installer hanging a new medicine cabinet during a bathroom remodel
A new medicine cabinet is an easy add-on to a vanity or shower update.

Census estimates put the median year built for a Farmington Hills home at 1978, close to the Oakland County figure of 1975. About 6 in 10 homes went up between 1960 and 1989, and about a quarter in the 1980s alone. About 56% are detached single-family houses, about 65% are owner-occupied, and homes are split fairly evenly between two, three, and four or more bedrooms.

In homes this age we often find steel and cast iron tubs, wall tile set in mortar over wire mesh, acrylic panels added over old tile, and separate tub and shower areas in the same room. In their place go walk-in showers, new tubs, and grout-free Pro Stone cultured marble walls. For planning numbers, see typical bathroom remodeling costs.

  • Steel and cast iron tubs: replaced with a new tub, as near 11 Mile and Inkster, or with a walk-in shower
  • Acrylic panels over old tile: removed with the tile before new Pro Stone walls go up, as near 12 Mile and Inkster
  • Two wet areas in one room: combined into one larger shower, as in a condo near Grand River
  • Every home: a written, all-in price after we measure, covering materials, labor, haul-away, and cleanup

What we install

Bathroom Remodeling Services in Farmington Hills

Most Farmington Hills projects start with one of these five. Bring your questions to the free consultation, and we will bring the samples and a written price.

Farmington Hills Reviews

Why Farmington Hills Homeowners Recommend Home Pro USA

Real Google reviews from bathroom remodels: walk-in showers, clean crews, and clear communication that Oakland County homeowners look for.

Farmington Hills FAQs

Farmington Hills Bathroom Remodeling Questions

Straight answers, drawn from bathrooms we have remodeled in Farmington Hills.

  • How long does a bathroom remodel take in Farmington Hills?
    Tub-to-shower conversions and tub replacements with Pro Stone walls take 2-4 working days. Full remodels take 5-10 working days, depending on scope, like the upstairs bath near 12 Mile and Inkster, where we replaced the tub with a shower and put in new walls, vanities, and flooring.
  • Can you replace just the tub and the walls around it?
    Yes. Near 12 Mile and Farmington Road, only the tub area changed: the cast iron tub and the wire-mesh tile around it came out, a 60-inch insulated steel tub went in, and Almond Bone Pro Stone walls and a ceiling panel finished it. Trim pieces cover the edge where the new walls meet the tile that stayed.
  • Can you turn a separate tub and shower into one shower?
    Yes. In a first-floor condo near Grand River, between Drake and Halsted, we removed a steel tub and a separate tiled shower with a pony wall, then built one 60-inch shower with Slate Pro Stone walls and a built-in bench.
  • Can you add a seat in the shower?
    Yes. Near 12 Mile and Inkster, the new shower has a Pro Stone corner seat, and the condo shower near Grand River has a built-in bench in Slate Pro Stone.
  • Can I get a double vanity?
    Yes. Near 11 Mile and Inkster, a white double vanity with a drawer bank went in under a 62-inch Carrera Pro Stone top with two wave bowls. Near 12 Mile and Inkster, two 24-inch vanities share one 69 1/2-inch Pro Stone top with two built-in bowls.
  • Which parts of Farmington Hills do you serve?
    All of Farmington Hills, including the 48331, 48334, 48335, and 48336 ZIP codes, from 8 Mile up to 14 Mile. We also work in nearby Farmington, Novi, Livonia, Southfield, West Bloomfield, and Bloomfield Township.
  • Are estimates free, and do you offer financing?
    Yes. The in-home consultation and written estimate cost nothing, and financing options are available. For planning numbers before we visit, see our Metro Detroit bathroom remodeling cost guide.
  • Since 1987Serving Metro Detroit
  • 18,000+Projects completed
  • A+BBB rating
  • W-2Our own installers, no subcontractors
  • Licensed& insured
  • One written, all-in price covering materials, labor, haul-away, and cleanup
  • Floors covered before demo and cleanup every day
  • Product warranties plus our workmanship guarantee

Farmington Hills • Oakland County

Ready to Remodel Your Farmington Hills Bathroom?

Tell us about the room. We’ll measure it, bring samples to your home, and give you a written all-in price. If you would rather see every material in person, our Center Line showroom is about 20 miles from Farmington Hills City Hall, usually a 25 to 35 minute drive by way of I-696.

1) Free Consult We measure the room and bring samples to you.
2) All-in Quote A written scope and one firm number.
3) Clean Install Our own crew, then a final walkthrough together.

No pressure and no spam. You get options, a timeline, and a clear price for your Farmington Hills bathroom.

Home Pro USA showroom in Center Line with Pro Stone, tile, vanity, and shower door displays
Showroom: 6490 E 10 Mile Rd, Center Line. Weekdays, plus Saturday appointments. Get directions
BBB A+ • Family-Owned Since 1987 • Serving Farmington Hills & Metro Detroit